MTS

Past Projects

Selected Works

Server installation and enterprise infrastructure services

Server Installation & Maintenance

Scope: Rack setup, configuration & lifecycle support

Thomson–East Coast Line (TEL) Stages 4 & 5 — ISCS deployment
Industrial electrical panels and cabling — representative of UPS and critical power environments

Jurong Island UPS Maintenance

Scope: Preventive & corrective power systems servicing

IMDA smart parcel locker installation

IMDA Smart Locker Installation

Scope: Deployment & commissioning of smart lockers

Server Infrastructure Installation and Maintenance

Server Installation & Maintenance – For Singapore Huawei International

Customer: Singapore Huawei International’s Clients Start Date: 2019
Server installation and enterprise infrastructure services
Modern compute and storage racks underpinning Singapore Huawei International’s client operations

Full-scope installation, commissioning, and maintenance of enterprise-grade infrastructure (server, storage, switches) supporting Singapore Huawei International’s clients’ operational backbone.

Customer’s Challenges

  • Need for high availability, low latency, and zero downtime server environments.
  • Growing demands for scalability as business expands.

Our Solutions

  • Deployed modular server systems allowing seamless scalability.
  • Installed full redundancy (power, network, storage) ensuring business continuity.
  • Provided 24/7 maintenance support with rapid-response teams.

Customers Outcome

Huawei now operates on a resilient, future-ready server platform, supporting expanding operations with high performance and fault tolerance.

Communications Systems Installation & Upgrades

TEL Stage 4 & Stage 5 ISCS Installation Works

Customer: Hollysys Asia Pacific Pte Ltd / LTA Project Duration: 2021 – Ongoing
Thomson–East Coast Line (TEL) Stages 4 & 5 — ISCS deployment
Thomson–East Coast Line (TEL) Stages 4 & 5 — ISCS Deployment

Installation, testing, commissioning, and handover of the Integrated Supervisory Control Systems (ISCS) across TEL Stage 4 and Stage 5, covering 11 stations (T302–T312) and the East Coast Integrated Depot.

Customer’s Challenges

  • Tight deadlines driven by national project milestones.
  • Frequent site adjustments and variation orders during construction.
  • Critical need for reliable system integration to meet regulatory approvals.

Our Solutions

  • Implemented agile project management to accommodate last-minute changes.
  • Optimized manpower and resources for night and weekend shifts to accelerate progress.
  • Conducted phased system tests to ensure handover with zero rework.

Customers Outcome

Achieved on-time delivery of ISCS installation, ensuring operational readiness for TEL 4 and TEL 5 opening. Enhanced public transport connectivity for thousands of daily commuters.

11
Stations (T302–T312)
1
Integrated Depot
Zero
Rework at Handover

Uninterrupted Power Supply (UPS) Systems

Jurong Island Battery Energy Storage System Maintenance

Customer: Huawei Project Duration: 2023 – 2033
Jurong Island BESS maintenance and AI-powered preventive contract
Jurong Island BESS Maintenance – AI-Powered Preventive Contract

Comprehensive maintenance contract for Battery Energy Storage Systems (BESS) across critical facilities, including health monitoring, fault rectification, and preventive maintenance.

Customer’s Challenges

  • Need for 24/7 system uptime and guaranteed battery health over 10 years.
  • Risk of downtime causing catastrophic service disruptions.

Our Solutions

  • Implemented predictive maintenance tools and AI-driven battery monitoring.
  • Regular health reporting and immediate troubleshooting protocols.

Customers Outcome

Peace of mind for Huawei with guaranteed system uptime, minimal performance degradation, and extended asset life.

Smart Locker Installation Projects

IMDA Parcel Locker Installation Works

Customer: RFNet Technologies Pte Ltd Project Duration: 2020 – Present
IMDA smart parcel locker installation
Nationwide Smart Locker Deployment under IMDA’s Smart Urban Logistics Program

Deployment of nationwide smart parcel locker network under the Infocomm Media Development Authority’s (IMDA) Smart Urban Logistics Program, supporting efficient last-mile delivery.

Customer’s Challenges

  • Tight nationwide rollout timelines.
  • High expectations on locker reliability and connectivity.

Our Solutions

  • Streamlined installation workflows with specialized teams across multiple regions.
  • Conducted rigorous system checks, ensuring seamless locker activation.

Customers Outcome

Successfully installed hundreds of smart lockers, enabling secure, convenient, and sustainable e-commerce parcel deliveries for Singapore residents.

Let’s Build the Future Together

Whether it's communications, UPS, smart locker networks, or high-resilience server systems — MTS Systems Engineering is ready to help you succeed. Let’s talk.

Contact Us